代理商售后维修区域:北京-上海-浙江-广东-河南-杭州-郑州-广州-深圳-佛山-惠州-厦门-汕头-台湾-香港-天津-西安-宝鸡-杭州-温州-常州-无锡-苏州-南京-镇江-扬州-南通-合肥-徐州-常熟-石家庄-太原-呼和浩特-沈阳-长春-哈尔滨-南京-合肥-福州-南昌-济南-郑州-武汉-长沙-广州-南宁-海口-成都-贵阳-昆明-拉萨-西安-兰州-西宁-银川-乌鲁木齐-杭州-沈阳-长春-哈尔滨-济南-武汉-广州-南宁-成都-西安-大连-宁波-厦门-青岛-深圳-杭州-淮安-连云港-昆山-嘉兴-湖州-秦皇岛-邯郸-邢台-保定-张家口-承德-廊坊-呼和浩特-包头-鞍山-大庆-锦州-铁岭-盘锦-湛江-萧山-辽宁-淄博-宁夏-绵阳-云南-朝阳-陕西-青海-北海-唐山-吉林-苏州-昆山-无锡-镇江-常州-连云港-淮安-淮阴-盐城-扬州-徐州-宜兴-江阴-南通-扬州-上海-滁州-内蒙古-新疆有销售.北京亦庄开发区,天津滨海开发区,秦皇岛经济开发区,太原经济开发区,呼和浩特经济开发区,沈阳经济开发区,营口经济开发区,大连经济开发区,长春经济开发区,哈尔滨经济开发区,虹桥经济开发区,漕河泾开发区,连云港开发区,南通开发区,昆山开发区,南京开发区,杭州开发区,萧山开发区,温州开发区,宁波开发区,芜湖开发区,合肥开发区,福州开发区,福清融侨开发区,东山开发区,南昌开发区,威海开发区,烟台开发区,青岛开发区,郑州开发区,武汉开发区,长沙开发区,萝岗区开发区,广州南沙开发区,惠州大亚湾开发区,湛江开发区,南宁开发区,重庆开发区,成都开发区,贵阳开发区,昆明开发区,拉萨开发区,西安开发区,兰州开发区,西宁开发区,银川开发区,乌鲁木齐开发区,石河子开发区,金桥出口加工区,苏州工业园,宁波大榭开发区,厦门海沧投资区,海南洋浦开发区。
| 可编程电源-电子负载 | 数字万用表 | 钳型表-钳形表-漏电流钳表 | 高压数字兆欧表 |
| 数字毫伏表 | 校准检验仪器 | 回路电阻测试仪-阻抗测试仪 | 微电阻计-微欧计-微欧表 |
| 电阻分选仪 | 电压控制仪 | 蓄电池测试仪 | 压力表 |
| 差压计-差压仪-压差计 | 钳式探头-传感器 | 插座测试仪 | 变频器 |
| 真空度测试仪 |
地网接地电阻测试仪
Recent year, the domestic many place transformer substations becauseare struck by lightning form the expanded accident, is mostunqualified with the network earth resistance related, therefore, mustvigorously strengthen to the network earth resistance regular monitor.
In the movement the transformer substation network earth resistancesurvey, as a result of the system inflow network electric currentdisturbance as well as the experimental lead wire space disturbance,causes the test result to produce a bigger error. The large-scale接地网 earth resistance very is specially small (generally in 0.5Omega below), even if the slight disturbance also can to test theresult to have the very tremendous influence. If to network earthresistance test plate out of true, not only damages the equipment,moreover can create such as the network to transform and so on bymistake the nonessential loss. At present, test 接地网 earthresistance method very many, mainly is the labor frequency bigelectricity 流法 and the different frequency power source law twokinds, in order to increase the measuring accuracy, former usesincreases the test electric current to increase the signal to noiseratio the means to reduce the disturbance the influence, but increasesthe test electric current to cause the equipment to be unwieldy,moreover certainly cannot completely solve the disturbance problem;Latter mainly depends on the change test power frequency (generally isabout 120Hz), thus avoids the 50Hz labor frequency disturbance, butthis method is unable to eliminate the test lead wire spacedisturbance, specially uses the air line to take when test lead wire,the error is quite big. In order to solve this problem, the HunanProvince electric power industry bureau document (the Hunan branch [1,997 ] 111)"about issued in 1997 the technical attack, thedevelopment and the technical achievement promotion plan notice" the38th item has issued "in the movement the large-scale transformersubstation 接地网 earth resistance test and the research" theattack plan, united the attack with the Central China technicaluniversity, has solved the labor frequency inflow network electriccurrent disturbance and the test lead wire space disturbance question.This research results has won the Central China electrical networkgroup advance in technology second prize, the Hunan Province electricpower company advance in technology second prize.
Instrument characteristic
The volume small, the weight is light.
The wiring labor is small. Does not need the big electricitystreamline.
The measuring accuracy is high.
The antijamming ability is strong. Uses the different frequency multi-power sources method, coordinates the software and hardware filtertechnology, sharpened the antijamming ability; Eliminated the surveylead wire space disturbance through the computer data processing.
Operates simply, the liquid crystal display monitor directly producesthe measurement result.
Main technical specification
1. surveys scopes: 0 ~ 10 Omega
2. measuring accuracies: 2%
3. return routes resistances scope: 5 - 100 Omega
4. output currents 有效值: 1.0A
5. maximum output voltages: 100V
6. surveys lines request: Electricity streamline >= 1.5mm2
7. electric power supplies: AC220V±10%, 50Hz
8. external dimensions: 420×320×195
9. instruments weights: 6kg
ここ数年、国内の多くの所の変電所は落雷して形成して事故を拡大しますため、多数は地ネットの接地抵抗が不合格なことと関係があります、そのため、強力にネットの接地抵抗の定期的な監視測定に対して必ず強化しなければなりません。
中変電所ネットの接地抵抗の測量に運行して、システムを受けて流れ込んでネットの電流の妨害がおよび導火線の線間の妨害を試験しますため、結果をテストしてわりに大きい誤差を生むことを使用します。特に大規模のアースネットの接地抵抗のとても小さい(普通は0.5Ω以下で)、たとえかすかな妨害としても結果をテストすることに対してとても大きい影響を生むことができ(ありえ)ます。もしネットの接地抵抗に対してテストするならばが正確ではありませんて、損傷の設備だけではなく、その上たとえばの地ネットが誤って必要でない損失を改造することをもたらすことができ(ありえ)ます。現在、アースネットの接地抵抗の方法をテストするのはとても多くて、その中は主に仕事のしきりに大きい電流法異なることのしきりに電源法2種類でと、測量精度を高めるため、前者の採用は電流をテストしてSN比の方法に増大して妨害の影響に減少しにくることに増大して、しかし電流をテストして設備をさせることに増大するのがばかでかくて、その上完全に妨害の問題を解決しことができないます;後者は主によってテストの電流の周波数(普通は120Hz左右です)を変えて、それによって50Hz仕事をよけてしきりに邪魔して、しかしこのような方法は取り除いて導火線の線間の妨害をテストすることができなくて、特に採用して線を架け渡しますテストの導火線とする時、誤差はかなり大きいです。この問題を解決するため、湖南省電力工業局のファイル(湖南のニュース科[1997]の111番)の“1997年の科学技術の難関の攻略、開発と科学技術の成果の普及計画の知らせを下達しますに関して”の第38項は“運行の中で大規模の変電所のアースネットの接地抵抗のテストと研究”の難関攻略計画を下達して、華中理工大学と共同で難関を攻めて、仕事のネットの電流の導火線の線間を邪魔してテストする妨害の問題を解決しましたしきりに流れ込んで。この研究成果は華中の電力網グループの科学技術の進歩の2等賞を獲得して、湖南省の電力会社の科学技術の進歩の2等賞。
器具の特徴
体積が小さくて、重さは軽くなります。
配線する労動量は小さいです。大きいニュース流線を必要としません。
測量精度は高いです。
妨害の能力を抵抗するは強いです。異なってしきりに多い電源の方法を採用して、ソフト?ハードウェアの周波数の異なる電波の分離の技術に協力して、妨害を抵抗するの能力を高めました;コンピュータのデータ処理を通じて(通って)導火線を測量する線間の妨害を取り除きました。
操作するのは簡単で、液晶のスクリーンは直接測量の結果を提供します。
主要な技術の指標
1. 測量の範囲:0?10Ω
2. 測量精度:2%
3. 回路の抵抗の範囲:5—100Ω
4. 電流の有効値を出力します:1.0A
5. 最大の出力電圧:100V
6. 線の要求を測量します: ニュース流線≧1.5mm2
7. 電源を電力を供給します:AC220V±10%,50Hz
8. 外形の寸法:420×320×195
9. 器具の重さ:6kg
| CopyRight 2013 版权所有 就是要仪器
宏胜集团北京中仪伟信科技有限公司 |
||
京ICP备09060824号-10 京公网安备11010602004306号-8
|
||