你好!欢迎光临北京中仪友信科技有限公司!已注册[登录] 新用户[免费注册]
免费销售电话
就是要仪器网>>产品中心>>建筑工程及物探>>腐蚀控制产品>>附件及安全>>

TY10LP钢管支架系统ZX21

TY10

LP钢管支架系统

ZX21
LP钢管支架系统
订 货 号:ZY351353 品    牌:英国密析尔MICHELL 产    地:英国 市 场 价: 折 扣 价: 发货周期:现货或5天内
加入购物车 支付宝购买 询价留言
分享到:分享到搜狐微博 分享给QQ好友 分享到爱分享 分享到白社会 分享到开心网 分享到人人网 分享到豆瓣 分享仪器
产品描述技术方案相关仪器最新上架商品咨询使用评价
Overview
The Clock Spring® Pipe Support (PS) System provides effective protection at support or hanger locations. It can be applied quickly and easily. No special tools or training are required.
Clock Spring® PS consists of a high-strength corrosion resistant fiberglass composite sleeve, a high performance adhesive, and a filler material.
The fiberglass composite sleeve is uniquely coil-shaped and sized to wrap tightly around pipe diameters from 3/4” to 36” providing two (2) individual layers bonded together resulting in a laminate thickness of approximately 1/8”.
Clock Spring® repairs are fast, economical and easy. Since no cutting or welding is required, there are no risks to the environment, release of greenhouse gases or waste disposal problems.
It’s simply the smartest pipeline repair decision you can make!
Specifications
Sleeve Specifications
Use, Designed as full encirclement wrap to provide wear surface and eliminate crevice corrosion at pipe support interface. May be used on pipe with less than 30% thru-wall loss.
Standard Configuration, 2 layers
Nominal Thickness, 1/8" (3 mm)
Application Temperature, 0°F to 120°F (-18°C to 49°C)
Service Temperature, -20°F to 130°F (-29°C to 54°C)
(For temperatures below -20°F (-29°C) contact CCP)
Material, Fiberglass and Polyester Resin
Width, 11.500" ± 0.500" (292 mm ± 13 mm)
Adhesive Specifications
Lap Shear Strength, > 1200 psi
Shelf Life, 12 months from Date of Manufacture
Filler Specifications
Compressive Strength, > 8000 psi
Shelf Life, 12 months from Date of Manufacture
Activator Specifications
Shelf Life, 12 months from Date of Manufacture.
(Note: Refrigeration at 38° - 52°F (3° -11°C) will extend material shelf life by an additional 3 months)
Installation
Clock Spring Pipe Supports typically consist of two concentric wraps of the Clock Spring® composite shell. The shell is in the form of a split sleeve, with a circumference slightly smaller (0.063-inches (1.5 mm) than the pipe being protected. Each shell will fit around the pipe leaving a slight longitudinal gap. Each layer of the Pipe Support will be applied such that the longitudinal seams are staggered from the longitudinal seams of the preceding layer.
Clean the pipe surface to be protected, removing all scale, loose debris, products of corrosion, and residual pipe coating. The surface should contain a slight anchor pattern as specified in the NACE #3 Surface Finish standard. Sand blasting the pipe surface is recommended. Wire brushing alone is not an acceptable surface preparation. If wire brushing is used to clean the pipe surface, an anchor pattern should be applied using an appropriate sanding disk.
Carefully inspect the pipe dents, gouges, scrapes and corrosion. Any damaged areas will be evaluated using appropriate NDE techniques.
The filler material is a Methacrylate adhesive consisting of a paste and an activator. The filler and activator will be mixed according to the pipe temperature. Refer to the chart on the Filler tube for the proper mix ratio. Table 2 below is provided for reference only. Mix the filler and activator for 3 minutes until the mixture is uniform in color and completely mixed.
Apply filler material to all voids under the repair.
The adhesive is a Methacrylate consisting of an adhesive and activator. The mix ratio will depend on the application temperature. Refer to the chart on the Adhesive container for the proper mix ratio. Table 1 is provided below for reference only. The mix ratio, ambient air temperature and pipe temperature will all affect the working time available before the adhesive cures.
Determine the correct mix ratio. Mix adhesive and activator according to standard Clock Spring procedures.
Liberally apply the mixed adhesive to the filler material and pipe surface to be protected.
Apply the first concentric sleeve over the filler and adhesive.
Apply filler material to the longitudinal seam of the first wrap and adhesive to the surface of the first wrap.
Applying adhesive between each layer, apply subsequent layers of composite sleeves with the longitudinal seam positioned away from the longitudinal seams on the underlying layer.
Continue the installation process until the entire support is complete and all layers are in place.
Using the band clamps supplied, tighten the repair onto the pipe. The band clamps are spaced evenly along the repair and tightened from the center out to each end. Clean excess adhesive and filler material.
When the adhesive has fully cured, remove the clamps and coat the support area with a protective coating
 
购买提示  

LP钢管支架系统

购买提示

1.阁下有任何产品问题请致电400-663-9117.
2.中仪将提供北京、上海、深圳、南京、重庆送货上门服务.
3.我们提供LP钢管支架系统计量送检,在签收前请详细核查资料信息.
4.TY10LP钢管支架系统价格根据配置和货期不同而不同,具体以合同为准.
5.我们为阁下提供保修TY10LP钢管支架系统售后维修服务,提供后期技术支持.
6.阁下对TY10LP钢管支架系统使用方法等有需求时,将为阁下找到LP钢管支架系统说明书.
最近浏览

英国密析尔MICHELLLP钢管支架系统

代理商厂商品牌售后维修区域:北京-上海-浙江-广东-河南-杭州-郑州-广州-深圳-佛山-惠州-厦门-汕头-台湾-香港-天津-西安-宝鸡-杭州-温州-常州-无锡-苏州-南京-镇江-扬州-南通-合肥-徐州-常熟-石家庄-太原-呼和浩特-沈阳-长春-哈尔滨-南京-合肥-福州-南昌-济南-郑州-武汉-长沙-广州-南宁-海口-成都-贵阳-昆明-拉萨-西安-兰州-西宁-银川-乌鲁木齐-杭州-沈阳-长春-哈尔滨-济南-武汉-广州-南宁-成都-西安-大连-宁波-厦门-青岛-深圳-杭州-淮安-连云港-昆山-嘉兴-湖州-秦皇岛-邯郸-邢台-保定-张家口-承德-廊坊-呼和浩特-包头-鞍山-大庆-锦州-铁岭-盘锦-湛江-萧山-辽宁-淄博-宁夏-绵阳-云南-朝阳-陕西-青海-北海-唐山-吉林-苏州-昆山-无锡-镇江-常州-连云港-淮安-淮阴-盐城-扬州-徐州-宜兴-江阴-南通-扬州-上海-滁州-内蒙古-新疆有销售.北京亦庄开发区,天津滨海开发区,秦皇岛经济开发区,太原经济开发区,呼和浩特经济开发区,沈阳经济开发区,营口经济开发区,大连经济开发区,长春经济开发区,哈尔滨经济开发区,虹桥经济开发区,漕河泾开发区,连云港开发区,南通开发区,昆山开发区,南京开发区,杭州开发区,萧山开发区,温州开发区,宁波开发区,芜湖开发区,合肥开发区,福州开发区,福清融侨开发区,东山开发区,南昌开发区,威海开发区,烟台开发区,青岛开发区,郑州开发区,武汉开发区,长沙开发区,萝岗区开发区,广州南沙开发区,惠州大亚湾开发区,湛江开发区,南宁开发区,重庆开发区,成都开发区,贵阳开发区,昆明开发区,拉萨开发区,西安开发区,兰州开发区,西宁开发区,银川开发区,乌鲁木齐开发区,石河子开发区,金桥出口加工区,苏州工业园,宁波大榭开发区,厦门海沧投资区,海南洋浦开发区。

按字母分类: A| B| C| D| E| F| G| H| I| J| K| L| M| N| O| P| Q| R| S| T| U| V| W| X| Y| Z| 热门一| 热门二| 热门三| 热门四| 热门五|


中仪主页联系中仪了解中仪版权声明友情链接站点地图广告服务
CopyRight 2003年创立  版权所有  MRO工业品就是要仪器网
(5)
产品对比产品对比 隐藏对比框
对不起,您还没有选择产品
开始对比清 空